13.1 Planning: Audience, Questions and KPIs
Plan the decision before opening the chart menu
Abhishek, a Pune operations manager, opens a grocery delivery report before the morning huddle. A large green card reads “Sales ₹49,50,000.” He sees an upward arrow but does not know whether that includes both cities, covers the full month, or counts orders the team later cancelled. The number looks precise. He still cannot decide whether his city met its delivery plan. Your first job as the dashboard builder is to let a reader answer that kind of question without tracking you down.
Imagine a Blinkit-style delivery service. The people, amounts and work decisions are fictional and do not describe how any real platform operates. In this lesson you will build a plan for a state head and a city manager, agree on metric definitions, compare a full-month result with its correct target and test honesty about missing numbers. Later pages implement the plans with ordinary Excel Tables, PivotTables, displays and filters.
A KPI is a defined measurement connected to a decision. Write who uses it, the exact eligible records, the unit, the time period and what comparison will trigger a useful action.
Listen for the decision hidden in the request
- State head. Priyanka wants to know after month close where recorded delivered order value missed the approved plan. She may ask a city lead to investigate a shortfall.
- City operations manager. Abhishek checks the most recently verified day for his city. He may investigate slow deliveries or a drop in reporting coverage before scheduling another shift.
- Finance analyst. The analyst wants documented amount definitions, target ownership and a reconciled month total. They may hold a report if amounts or cutoff rules are unresolved.
- Shift coordinator. The coordinator needs a trustworthy set of recent time bands and how many eligible records are still missing. An all-city monthly amount cannot answer which shift needs attention.
In a planning conversation ask each audience for a decision they made last week and the evidence they used. “Give me sales, orders and a chart” is a feature request. “I want to see which city missed its approved monthly amount by the time I run the review” defines a result you can design around. For each proposed card, ask what a reader should do if the measure is above or below the threshold. If the audience cannot agree on the action or definition, include a question in the project notes and confirm it before presenting a performance label.
Write four or five questions a beginner can test
- Recorded amount. What delivered order amount did the state record this month under the approved source definition?
- Against plan. Which city, within the approved comparison scope, is furthest below its assigned target in rupees?
- Value per order. What is the average delivered order amount relative to the previous comparable month?
- Reliability. What proportion of placed orders were cancelled, and is that within the agreed ceiling?
- Speed and coverage. How many delivered orders have validated timing, and how many of those met the defined promise?
Platform and category may be useful questions later. Your initial view can support city, date and platform without showing a different card for every field. A product breakdown requires product-level evidence. The chapter's simple order-level source cannot preserve which products make up a basket just by adding a Category slicer. Add that question to the plan only with a defined dimension, tested model and matched metrics. An unanswerable question is useful planning information as long as its limits stay visible.
Give the workbook a metric dictionary
Start a plain Notes sheet with a row per measure
A metric dictionary is a list of agreements about numbers. In the Notes sheet add columns for Display label, Reader and decision, Eligible records, Calculation, Display unit, Time and filter scope, Comparison source, Good direction, Missing-data rule and Owner. You can add a Checked date and Version to show whether a team member confirmed the definition. A formula can be correct in Excel while implementing an old agreement. A current Notes sheet helps you catch that mismatch.
A numerator is the value before division and a denominator is the value you divide by. If a card shows a rate or average, write both in words. For delivered order AOV, the numerator is the sum of recorded order amount on delivered orders, and the denominator is the count of the same delivered orders. For a cancellation rate about orders placed this month, the numerator is that month's placed orders whose final or current approved status is Cancelled at the cutoff. The denominator is all approved placed orders in the same scope. Returns, re-opened orders and duplicate status updates require additional rules with the source owner. This lesson starts with one row for each current approved order.
| Measure | Eligible population or calculation | Comparison | Desired direction |
|---|---|---|---|
| Delivered order amount | Sum approved rupee order amounts on delivered orders | March state plan ₹48,00,000 | At least the target |
| Average delivered order value | Delivered order amount ÷ count of those delivered orders | Comparable prior month ₹362 | Monitor increases and investigate mix |
| Cancellation rate | Cancelled placed orders ÷ eligible placed orders at cutoff | Maximum 5% | At or below the ceiling |
| Average verified delivery minutes | Sum validated durations ÷ timed delivered orders | Adopt 12 minutes as an explicit average goal for this practice | At or below the goal |
The previous table uses 12 minutes as a specific goal for a mean. That differs from a per-order promise. A mean of 11.6 minutes can meet a 12-minute average goal with several orders taking much longer. To check a promise, count deliveries on time according to the agreed per-order rule and divide by eligible deliveries with verified timing. Record the coverage and any exclusion. You need the appropriate event or order data to compute that second measure. A single average cannot reveal the fraction below any one threshold.
Plan which measure needs a status label
Not every larger number is automatically good. A larger average delivered order amount could reflect another product mix, fewer small orders, discounts ending, or a different group of customers. Define what the measure signals and which follow-up is reasonable. Cancellation rate often has a maximum agreed threshold. Delivered amount may have a minimum plan. Use “At or above plan” for a threshold that includes equality. For a directional trend with no adopted threshold, use “Above last month” alongside the evidence and leave judgement to the reader.
A target and an action threshold can also differ. For example, a city can be below a target with no need for immediate escalation, but a shortfall above ₹20,000 can trigger a call. Record both the comparison result and the separate follow-up rule. If you introduce a warning band, define exactly which interval it covers and include text labels beyond any color you choose. A screened report with grey icons can still communicate “Below plan · review” clearly if the rule is expressed in text.
Confirm where the KPI term is used in Excel
This chapter uses ordinary worksheet cells, PivotTable fields and visual cards. A KPI is its business definition and status in that design. Microsoft also offers a Power Pivot KPI model feature with a base measure, target and thresholds for supported environments. You can learn that tool later after you have a stable definition. A card built from a formatted cell qualifies as a meaningful performance indicator when the audience understands the comparison and can verify its calculation. Drawing a green shape alone cannot give a raw number the same context.
Test two teams that tie on average
Consider two fictional four-order teams near the end of a shift. One records durations of 8, 10, 13 and 15 minutes. The other records 11, 11, 12 and 12. Both sum to 46 minutes and average 11.5 minutes. With an agreed promise of no more than 12 minutes, only two of the first team's orders meet the promise, compared with all four of the second team's orders. The difference could matter if the decision is whether to follow up on missed promises. Ask which question the manager needs first before choosing a card.
| Team | Order 1 | Order 2 | Order 3 | Order 4 | Mean minutes | On time |
|---|---|---|---|---|---|---|
| Shift A | 8 | 10 | 13 | 15 | 11.5 | 50% |
| Shift B | 11 | 11 | 12 | 12 | 11.5 | 100% |
On a disposable practice sheet put the shift names in A2:A3 and the duration inputs in B2:E3. Enter =AVERAGE(B2:E2) in F2 and =COUNTIF(B2:E2,"<=12")/COUNT(B2:E2) in G2 for this fixture of four validated numeric durations. Fill both down one row. If you later permit blanks, text or invalid times, use an approved duration flag in a checked order list and test eligibility before dividing. In this fully populated fixture every duration is known. Exactly 12 is included because the agreed test uses less than or equal to.
Add a definition card that says “Confirmed on time at 12 minutes or less, order-level, numerator count and coverage shown.” If one of the Shift B durations is later missing, confirmed on time can remain 100% while coverage drops from four of four to three of four. A reader may decide to wait before comparing two shifts with unequal completeness. Adding both labels gives them enough context to make that choice.
Align every comparison with the selected scope
Identify the actual period and unit
A “March” filter should identify March of a known year. The date field might be Order placed date, Delivered date or accounting recognition date. They can differ for an order made late on March 31 and delivered on April 1. For a placed-order cohort report, keep that order in March and indicate what was known at the cutoff. For completed delivery workload dated by delivery event, use the actual April event date. The title and Notes should say which date the chart uses. A reporting timezone may affect the boundary when times come from different systems.
Choose a consistent money unit. ₹49,50,000 is also 49.5 lakh rupees, and ₹48,00,000 is 48 lakh. Either is usable if both units match and the display is clear. Multiplying or applying a number format changes different things. A format can alter how a numeric amount appears. A unit conversion formula changes the number used in subsequent arithmetic, so state the scale and use it consistently. Formatting a euro amount with a rupee symbol does not convert currency. Use documented exchange rates and scope if a future dashboard requires conversion; this one uses only rupees.
Check target ownership and granularity
Suppose an analyst receives one state-level target and no city allocations. The city slicer can filter recorded order values, but it cannot manufacture a city target. If the dashboard displays Pune against the whole state's March target, a ratio can be arithmetically correct yet misrepresent performance. Keep the state target in an explicitly separate statewide comparison or display “City target unavailable” for the selected city. If the organisation later supplies one verified target per city and month, reconcile those targets with the overall plan before summing them.
The word grain applies to target data too. A target table might have one row per city and month. Joining that target to every order row repeats it once per matching order, so a sum of target amounts would multiply the same plan. If Pune had three orders and a plan of ₹3,000 for their entire selected period, copying ₹3,000 to each order creates a misleading repeated sum of ₹9,000. Keep a separate target lookup or summary at the intended unit, and only combine values at shared scopes.
Date choices can cause a similar mismatch. A total through March 15, a full March amount target and a separate target for March 1–15 represent three facts. A report can say “51.0% of full-month plan achieved so far,” but that does not by itself mean the team missed the plan. The fair interim comparison depends on the approved pacing plan, operating days and cutoff. Some businesses plan differently around weekends and events. A straight daily split may be used as a classroom illustration with an explicit assumption.
Lab 1. Work the March scorecard before building cards
Prepare an actual, baseline and target table
| Input | Value | Meaning |
|---|---|---|
| Recorded delivered amount | 4950000 | All cities in agreed March scope |
| Monthly amount target | 4800000 | Approved March state target |
| Placed orders | 14000 | All eligible March orders placed |
| Delivered orders | 13200 | Final approved delivered status |
| Cancelled orders | 560 | Final approved cancelled status |
| Comparable previous Average order value | 362 | Same delivered definition |
| Cancellation ceiling | 0.05 | At most five percent |
| Verified mean delivery minutes | 11.6 | Known durations for delivered orders |
| Delivery minutes goal | 12 | Target for average duration in this exercise |
On a practice Notes sheet, type the first three headers in A1:C1 and the rows in that order through row 10. The values in column B are numeric. Display B8 as a percentage and keep the other entries in their own units. Use a separate output area for the calculations. This keeps a percentage value, a date and a money value from being treated as interchangeable solely because Excel stores each as a number.
State plan attainment =IF(B3>0,B2/B3,"No comparable target")
Amount above plan =B2-B3
Delivered order AOV =IF(B5>0,B2/B5,"No eligible delivered orders")
AOV change vs prior =IF(AND(ISNUMBER(B7),B7>0,B5>0),B2/B5/B7-1,"Comparison unavailable")
Cancellation rate =IF(B4>0,B6/B4,"No eligible placed orders")
Cancellation gap =IF(B4>0,B6/B4-B8,"No eligible placed orders")
Average speed gap =B9-B10
Unclassified in summary =B4-B5-B6
- Check the full-month plan. The fictional amount is ₹1,50,000 above target. Attainment is 103.125%. If you display one decimal it reads 103.1%. “At or above plan” has a clear comparison and a known scope.
- Check AOV. ₹49,50,000 divided by 13,200 gives ₹375. The comparable prior value of ₹362 makes the absolute increase ₹13 and the relative change about 3.59%. Show the absolute difference in rupees and relative change as a percentage if both support the discussion.
- Check the cancellation boundary. 560 out of 14,000 is 4.0%, one percentage point below the 5.0% ceiling. The relative reduction compared with the ceiling is 20%, a different quantity. Use the percentage-point difference when describing the status gap.
- Check the time claim. The average is 0.4 minutes below its goal. You cannot calculate an on-time rate from this aggregate. Ask for the count meeting the agreed limit and the total number of eligible timed orders.
- Check population coverage. The placed count exceeds delivered plus cancelled by 240. The summary does not classify those rows. Ask for the remaining authorised status breakdown rather than calling them all cancelled or late.
In a comparative view, add an alert for an implausible result like delivered orders exceeding placed orders for a matching placed-date cohort. A positive denominator guard only confirms you can divide. It does not establish that both counts come from compatible populations. Document what verification you performed before publishing the card. With this exercise, all amounts and counts are available in the input table and you can check every result by doing the arithmetic separately.
Build the argument for the round March number
Ask who will act
The state head needs to decide whether to start follow-up after March closes.
Write the scope
Both amounts cover the same March state scope and use rupees. The actual counts only the agreed delivered order amounts.
Calculate the result
₹49,50,000 against ₹48,00,000 is 103.125% and an absolute difference of +₹1,50,000.
Write the display and action
Show “103.1% of state plan · March 2026.” Check city allocations before deciding which city requires action.
Lab 2. Decide what the report can say on March 15
Practise a partial-month and city selection
In a fresh section on the practice sheet, write down these alternate figures. The month has 31 days. The verified period so far is March 1–15 inclusive. The state delivered value through that cutoff is ₹24,50,000 and the full state target remains ₹48,00,000. A city manager selects Pune with ₹9,10,000 of value through the same cutoff. No city-level or allocated interim target has been provided.
| Input | Value | Covered period or population |
|---|---|---|
| State delivered amount to date | 2450000 | State through March 15 |
| Pune delivered amount to date | 910000 | Pune through March 15 |
| State target | 4800000 | Full March state plan |
| Elapsed reporting dates | 15 | March 1–15 inclusive |
| Calendar month dates | 31 | March 1–31 inclusive |
- Show legitimate progress. State value divided by the full state target is about 51.0%. Label it “51.0% of full-month state plan achieved through March 15.” As a measure of progress it is useful and clearly incomplete.
- Model one pacing assumption. Under a simple daily pacing assumption, expected state amount through 15 of 31 calendar dates is about ₹23,22,580.65. The actual is about ₹1,27,419.35 above that illustrative pace. The actual pacing goal needs to come from the planning owner.
- Test the city trap. Pune divided by the state plan is about 19.0%. That figure can describe Pune's contribution toward the full state plan, given the right label. It cannot establish Pune performance versus its own approved target because no Pune target is supplied.
- Write two possible manager messages. State display “Progress through March 15: ₹24,50,000 of ₹48,00,000 full-month target.” Pune display “Delivered order amount to March 15: ₹9,10,000 · City target unavailable.”
- Design one fair comparison request. Ask for the March 1–15 city plan if the decision is an interim target review. For a week-over-week comparison request the same business days and time cutoff under the same delivery status definition.
To verify the lab, have one person read only the display sentence and answer whether the month is over and whether Pune hit its target. The first answer should be “the data covers through March 15.” The second should be “no Pune target was available.” If the reader answers “Pune is 81% below plan,” the scope wording did not carry through to the card. Rewrite it and compare again. Testing the sentence is part of planning the display.
Discuss an outage without inventing a business result
Imagine fresh data arrives for App but the Web file is missing after 10:00. The approved state dashboard previously included both. Continuing to show the App-only figure under an “all platforms” label creates an apparent decline with a changing denominator. You can keep the latest verified complete snapshot and label its cutoff, or expose the partial App scope deliberately while marking Web as pending. The correct choice depends on audience urgency and data policy. In either view the reader should be able to tell the missing input from delivered orders that genuinely recorded zero.
Work through another empty-state comparison. Suppose a Pune filter is valid and no eligible deliveries occurred on its selected date. Show delivered order count 0 as the outcome of the checked filter. AOV is unavailable because there are no orders to divide by. If there are two confirmed delivered orders with zero recorded amount under the agreed metric, AOV can be a genuine ₹0. In a source outage the report can't verify the count. Write three separate conditions and their display labels so the implementer can represent each one deliberately.
Choose the baseline that matches the decision
Write one version of each comparison sentence before choosing a formula. “Against approved March target” tells you to use a target table. “From the previous full calendar month” tells you the dates and likely scope. “From the same weekday last week” makes sense for a day-to-day operations review if the audience needs to smooth common weekday effects. Use the same verification cutoff when the team compares afternoon snapshots. A 10:00 count and a full-day total can have the same unit and city, yet tell a misleading comparison story.
For a running operational example, suppose Pune processes 96 orders as of 10:00 today and had 120 by 10:00 on the comparable day. The difference is 24 fewer, or a relative drop of 20%. That earlier day's completed total of 200 would imply a 52% decline if used carelessly. Both divisions are mechanically possible. The first comparison answers how much activity changed by the same cutoff. The complete-day total might suit forecasting day's remaining pace using a different model, with its own scope and stated assumptions.
Growth from a zero baseline also needs an explicit answer. Moving from 0 approved orders to 30 approved orders is an increase of 30. The percent change from a denominator of zero is unavailable. A reader can still use the absolute count and ask whether a new service came online. If the earlier baseline is unknown due to a missing file, the absolute difference is also unknown. A well-written plan states these messages before the formula builder chooses how the card reacts.
A target table can fail its own validity check
Imagine the planning owner submits two rows for Pune and March because the latest allocation was pasted below a draft version. A lookup that takes the first match can display a plausible target with the wrong version. An ordinary sum of both rows can inflate it. Define one approved target row for each selected city and month, or distinguish version, scenario and approval status in a compound key. Test the candidate match count before pulling the amount. A result of zero means no target found; two means review duplicates or pick an approved version by rule. Only one matched, approved target can support the single-target exercise.
Compare this with actual order amounts. It is expected to sum many delivered orders for Pune and a month. The target is a single approved benchmark for that scope. These two sources have different grain, so a target check should focus on uniqueness and an actual check on completeness, status and matched period. In practice you can total each source independently and compare the two reviewed summaries. The documentation can make this clear without asking a new learner to design a many-table workbook before grasping the calculation.
Turn the plan into a reproducible design
Draw a simple reading order and request the missing fields
Begin a sketch with the title, intended scope and verified cutoff. Below it put the card values and the one comparison needed for the current decision. Arrange one city comparison and one time trend close to the decisions they support. Place the filters where someone can discover them before reading a card. The top or left side may work on a desktop grid. Use an order that still makes sense in a narrower view. Include definitions and detail below or on the Notes sheet, with specific labels to guide a beginner.
Use the sketch to list the fields the source must provide. For amount and delivery performance you may need a unique order key, the agreed date, city mapping, platform, approved final status and recorded amount. For promise metrics add validated order-level duration or actual and promised timestamps with the same timezone basis. For target comparison add a reviewed target and its unit, date, city and platform coverage. Label fields that are planned but unavailable and give the decision maker a plain sentence about which question cannot yet be answered.
Discuss whether the manager needs daily or monthly data. A monthly target should have a plausible daily pacing plan only when agreed. A daily table without the agreed comparison can still answer counts and amounts. If the state request also needs local area performance, find a reliable area mapping and define whether it reflects dispatch, delivery destination or store ownership. Pick a stable definition before changing the dashboard. A user selecting “Pune” expects the same city assignment across all intended cards and charts.
Set acceptance tests the reader can repeat
- Full scope. Expected March amount ₹49,50,000, delivered count 13,200, AOV ₹375 and 103.1% of the adopted state target.
- Partial scope. Expected state-to-date progress about 51.0% through March 15, with explicit date and target scope on the dashboard.
- City without a target. The Pune amount remains visible, while target status uses a meaningful unavailable label.
- No eligible orders. Confirm the displayed count, denominator guard and message without overwriting the metric formula with a manually typed zero.
- Changed input. Confirm that an updated source cutoff, expected chart results and Notes version follow the release checklist.
In a short peer review, hand over the Notes sheet and ask the reader to reproduce ₹375 without using the dashboard layout. Ask them to explain when cancellation can be compared fairly across cities. If both can state the correct denominator, observation date and agreed eligibility rules, the handoff has made reasoning possible. If they disagree, bring the data or planning owner into the discussion and settle the exact definition before the figures go into charts.
Specify what a warning asks someone to do
Make a three-state instruction for the cancellation card. If at most 5% of eligible placed orders cancel and the source is complete, show “Within cancellation ceiling.” If the rate exceeds 5%, show “Review cancelled orders” and identify the team that owns the status reason breakdown. If the underlying status extract is incomplete, show “Status data incomplete” and route that issue to the source owner. Three distinct instructions prevent an analyst from assigning staff based on a source lag. Decide separately whether a human reviewer must approve a public red status.
Use boundary examples before implementing the status formula. At 5.0%, the card remains within the agreed ceiling because the rule is inclusive. At 5.1%, the source and denominator have been checked and the card asks operations to review. If the status file is missing, neither percentage is available. With a low order count, the decision owner can request a minimum sample size. Two cancellations in 20 orders and 200 in 2,000 have the same 10% rate, but very different evidence and follow-up workload.
Give another analyst the threshold, source and sample values along with the sheet. Ask them to explain why the display for 5% differs from 5.1%. A useful response names the ceiling, the direction, the inclusive decision and the matching order population. It also says where to look if the underlying status definitions change during the next reporting period.
Ask for one concrete interpretation before approving a display
Share the paper plan with a city lead and ask them to distinguish a performance issue from a data issue. For example, low confirmed on-time performance with complete coverage calls for a different follow-up than missing duration records. Prepare one screened example of each. Label the data issue clearly and choose a text status the team has agreed to use. Record who will verify the missing data and where readers should look for a correction. That short conversation is a practical acceptance test of the Notes sheet and a good way to refine the final report.
Check your plan before building
Five short practice checks
Who decides which amount counts as delivered order value?
The team that owns the source and the relevant business policy should confirm it. The builder records the eligible statuses, amounts, dates and units in the metric dictionary.
What is the March status against the full state amount target?
₹49,50,000 divided by ₹48,00,000 is 103.125%, or 103.1% at one decimal. The actual exceeds the approved target by ₹1,50,000.
If the scope is one city with no supplied city target, should the KPI show attainment?
Report the verified city amount and state “City target unavailable.” A separate comparison to the entire state plan requires a different label, purpose and interpretation.
Is a drop from 5.0% to 4.0% one percent?
It is one percentage point, or 20% below the comparison rate relative to 5.0%. State which calculation you use.
What should AOV show if there are no delivered orders?
Show that the average is unavailable for the empty scope. The count is a measured 0. The ratio has no eligible denominator.
Five interview questions with worked answers
How would you work with two audiences who want different KPIs?
I elicit their decisions and timing first. I maintain shared definitions where the metrics mean the same thing, then provide a primary view and focused supporting detail rather than fitting every chart on one page.
Which fields belong in a KPI definition?
I include the decision and owner, eligible population, function or numerator and denominator, time and filter scope, units, comparison rule and missing data treatment. I also store a small exact test case.
Why could a city percentage be misleading when compared against the state plan?
The city recorded amount covers a smaller population. It can describe state-plan contribution if labeled that way, but performance against a city target needs an approved target at the same grain.
How can a dashboard communicate a partial month accurately?
I state the verified cutoff and label progress against the full plan. I only call it ahead of or behind interim plan when a documented time-matched target gives that comparison meaning.
What is the difference between average speed and an on-time rate?
The average adds validated order durations and divides by their count. The rate counts qualifying orders under an agreed limit and divides by eligible timed orders. Both need their own comparison and coverage.
Revision cards
- Reader and action. Name the person, meeting and decision.
- Metric definition. Eligible records, units, date, formula and owner.
- Comparison scope. Verify city, dates, currency and order grain.
- Status. Record threshold, good direction and required follow-up.
- Coverage. Approved zero, no denominator and missing inputs differ.
- Handoff. Save exact example answers before building charts.
Continue to 13.2 to organize the dashboard workbook, or revisit the chapter overview for the smaller five-order lab.