Ravindra BagaleCourses & study guides मराठी Track your progress

8. Charts

Excel

8.8 Waterfall and Funnel

1. Tell a running balance from a count of people still in a process

A trainee on a fictional shop team has two questions for the monthly review. The first asks how sales went from 5.0 lakh rupees in October to 6.1 lakh in November. The second asks how many people from the same visit cohort reached a delivered order. Both questions involve a sequence, but the numbers in their rows mean different things. The sales answer needs a starting amount, signed changes and a verified ending amount. The delivery answer needs counts of the same population reaching progressively narrower stages.

Think of a learning exercise inspired by the checkout stages shoppers encounter when using apps such as Swiggy. The values and operating rules on this page are made up. They do not describe a real company's traffic, sales or analysis. Use a waterfall to reconcile a balance from change components. Use a funnel to express progression when counts come from a clearly defined nested cohort. In both cases run the arithmetic and verify the underlying grain before creating the chart.

Pick the row meaning first. A waterfall's intermediate rows are signed amounts of change. A funnel's rows are counts or measures at stages under a stated population definition.

Read the start and end of each chart

  • Waterfall opening and closing totals. They represent full levels. A total bar starts at zero and reaches the level. It summarizes the balance at that point.
  • Waterfall change. A change is added to or subtracted from the previous level. A floating mark spans the old and new level so its length represents the size of the change.
  • Funnel stage. It represents how many of the defined starting units have reached that stage under a consistent rule. In a nested sequence the count cannot increase at a later stage.
  • Funnel conversion. A stage's proportion can be calculated relative to the previous stage or the original starting population. Name which denominator you used.
  • Source evidence. An accurate graphic does not establish which activity caused a change or why people stopped. It identifies where to investigate.

A funnel's widths represent counts on a shared scale. Calculate conversion separately to show whether each label describes the prior stage or the start. If you plot changes as if they are levels, the comparison might imply the conditional amounts have the same role as the starting and ending balances. One useful preflight is to read three consecutive rows and explain how each number was calculated. This catches a total masquerading as a change or an order count being divided by unrelated visits.

2. Lab. Reconcile October and November sales with a waterfall

Goal. Start at 5.0 lakh, apply four signed allocations and close at the independently stated 6.1 lakh. Enter the first three columns below in A1:C7 on a sheet called Sales Bridge. Changes are artificial, mutually exclusive contributions defined by the exercise. The larger basket row labels a teaching allocation, not verified evidence of a festival effect. The fourth column gives the expected running level.

Fictional sales bridge, lakh rupees
StepInput amountRoleLevel after this step
October sales5.0Opening total5.0
New customer allocation0.8Increase5.8
Larger basket allocation0.9Increase6.7
Cancellations-0.4Decrease6.3
Returns-0.2Decrease6.1
November sales6.1Closing total6.1
Horizontal reading of a waterfall. October 5.0, then plus 0.8, plus 0.9, minus 0.4 and minus 0.2. November closes at 6.1 lakh. First and last bars start at zero.
The floating ranges span the previous and new account level. The November level is a total, not another contribution.

Follow the start, each signed change and the final check

  1. Verify amounts and roles

    Check all six inputs use lakh rupees. October and November are levels. Only the four middle rows are changes. Keep the role column for the work audit and use only the step and amount columns for the chart input.

  2. Compute a running balance independently

    Set D2 to B2. Enter D3 as D2 plus B3 and fill only through D6. The four running values should be 5.8, 6.7, 6.3 and 6.1. In D7 display the independently stated November total from B7; compare it to D6.

  3. Insert the waterfall

    Select A1:B7 and choose Waterfall on a supporting Excel build. Inspect the order. Use the single-point Set as Total option for November and, where needed, the opening column. Select a single bar rather than the entire series.

  4. Read the sign and level separately

    The cancellations bar goes from the previous 6.7 down to 6.3. Its own amount is -0.4. The return bar covers the next 0.2 reduction. Connector lines can help show which two adjacent levels a change connects.

  5. Reconcile both totals

    Changes sum to +1.1. The close must be 5.0 plus 1.1, or 6.1. November should start at zero and end at 6.1, rather than stack an additional 6.1 on top of its own computed close.

D2 =B2
D3 =D2+B3
D7 =B7
Bridge difference =ROUND(B2+SUM(B3:B6)-B7,10)

Investigate a closing bar that rises to 12.2

With the closing total treated as a new increase, it begins at the cumulative 6.1 and adds another 6.1. The chart then reaches 12.2 even though the figures are individually correct. Set the closing bar as a total rather than editing the November value to zero. The role is wrong, not the numeric amount. If the right-click menu shows Format Data Series rather than Format Data Point, select only the final bar before choosing the option. The menu names and locations differ across Excel versions.

A heading such as November total does not automatically determine the chart's role. Check the visual start and end of the mark and compare with the independent value. The teaching image lays out the same arithmetic horizontally for legible labels on mobile. Excel's default waterfall draws vertical columns. Read its value axis instead of assuming it will look exactly like the illustration.

3. Lab. Follow the same starting cohort through four stages

Goal. Calculate previous-stage and starting-cohort conversion separately, and explain the largest numerical drop. Enter the first two columns in A1:B5 of a sheet called Cohort Funnel. In this invented case, one record means one eligible visitor for one defined cohort, counted once in each applicable stage. Track the first qualifying entry and a single nested path, within one completed follow-up window. A delivered record in this example is a visitor whose qualifying order reached delivery, rather than a count of every order that visitor placed.

Fictional unique visitor progression through a completed window
Stage reachedEligible visitorsShare of prior stageShare of starting cohort
Visits50000Start100%
Cart1200024.00%24.00%
Checkout850070.83%17.00%
Delivered790092.94%15.80%
Visitor funnel with widths proportional to counts 50000, 12000, 8500 and 7900 for visit, cart, checkout and delivered. Delivered equals 15.8 percent of start.
All counts use the same visitor unit. The tracks through each stage are nested for this training cohort.
  1. Set the stage order from the process. Visits comes first, followed by Cart, Checkout and Delivered. Keep their stated order instead of sorting by size. Confirm a later stage consists of visitors already counted at the previous stage under the exercise's event rule.
  2. Insert a funnel where supported. Select A1:B5 and choose Funnel from the chart gallery. Inspect labels and counts. If the chart type is unavailable, draw a zero-based horizontal bar chart with the same stage order, or keep the count-and-conversion table.
  3. Compute conversion from the prior stage. In C3 use B3 divided by B2 and fill through C5. Cart converts from Visits at 24 percent. Checkout converts from Cart at about 70.83 percent. Delivered converts from Checkout at about 92.94 percent.
  4. Compute conversion from the initial cohort. In D2 use B2 divided by the absolute starting total B2 and fill through D5. The delivered share of the start is 7900 divided by 50000, or 15.8 percent. It is not 92.94 percent of the initial visitors.
  5. Reconcile stage drop counts. The stage differences are 38000, 3500 and 600. They sum to 42100, the difference between the start and end. This reconciliation depends on the stage counts being nested for the same population and unit.
C3 =IF(B2>0,B3/B2,"")
D2 =IF($B$2>0,B2/$B$2,"")
E3 =B2-B3

Label column C Prior-stage conversion and D Start conversion. In C2 use Start rather than inventing a previous denominator. Fill E3 down only for the three adjacent differences. These formulas assume the source values are already approved numeric counts. A zero prior-stage count makes its next conversion undefined. In a nested cohort a positive later count after a verified zero earlier count signals a definition or data problem. Keep an exception status rather than publishing a ratio in that case.

Check the relationship between the two denominators

Using unrounded ratios, the three adjacent conversion rates multiply to the final share of the start. Each intermediate count cancels in the ratio product: 12000 divided by 50000, times 8500 divided by 12000, times 7900 divided by 8500. The result is 7900 divided by 50000. This only works as a useful process interpretation when the sequence is defined for one nested cohort. Round for display afterward. Multiplying fully rounded percentages can produce a slightly different reported value.

Read the largest loss in both count and share. Visits to Cart loses 38000, or 76 percent of the starting stage. Cart to Checkout loses 3500, about 29.17 percent of Carts. Checkout to Delivered loses 600, about 7.06 percent of Checkouts. A funnel can highlight where many counted visitors stopped before the next qualifying event. It cannot tell whether they stopped due to price, payment, measurement gaps or choice. Ask what was captured before assigning a cause.

4. Build the waterfall from a defensible set of contributions

Keep the signs, sequence and source definitions available

The bridge has two upward contributions, which sum to 1.7 lakh, and two decreases, totaling -0.6 lakh. Net change is +1.1 lakh. Relative to the opening 5.0 lakh, that is a 22 percent increase. These are different values serving different requests. A reader can check both the net movement and the ending level. A title such as Sales bridge from October to November identifies the accounting relationship, rather than claiming every component's underlying cause is proved.

Start and end levels need the same metric definition. If October is net of returns but November excludes returns, the difference may reflect a reporting change rather than business performance. Agree which revenue definition is used and which period receives corrections. The four allocations must reconcile exactly and avoid overlap. If a new-customer change already includes increased average baskets for those customers, double-counting their effect as a separate basket change will overstate the bridge. Use a documented decomposition or put an unassigned amount into a clearly labeled review line.

Check a contribution correction instead of forcing the close

On a copy change Cancellations from -0.4 to -0.5 lakh while retaining the independently verified closing level of 6.1. The running calculation with the edited components should now reach 6.0. The bridge difference becomes -0.1. Setting the final bar to Total does not fix the mismatch. It simply displays the stated total at 6.1. Check the raw source, confirm whether another contribution changed and label any unresolved difference before sharing. Restore the original inputs once the test is done.

For a process where you know the contributing amounts but do not have a separate closing amount, derive the closing amount and label it calculated. For an audit where opening and closing are independently recorded, bring both and reconcile them. If no source supports the missing 0.1, a decimal rounding adjustment should not be invented. Work in the precision the data support and show a rounding policy only if the actual difference follows it.

The example uses decimal amounts expressed in lakh rupees. A cell calculation can represent some decimal inputs approximately. ROUND in the audit filters tiny representation differences for this training fixture while preserving the deliberate one-tenth-lakh mismatch. For a real workbook, choose a check appropriate to the units and supported source precision, such as reconciling in integer minor units if those are supplied. Do not treat ROUND as permission to hide a known change. Keep the raw reported value and the independently computed close available for review.

Be consistent about signs when the source records reductions as positive magnitudes. The worksheet may list four hundred in a separate Cancellations column and make its direction clear through that column name. In a bridge input the same reduction needs a negative sign because it participates in the sum. Check the conversion using one input you can trace across both formats. Reversing a -0.4 reduction to +0.4 would raise the running close by 0.8 lakh. The role color cannot catch that conversion mistake on its own.

Use a real intermediate subtotal without adding it again

Suppose the audience wants a mark for the level after the two increases. That checkpoint is 6.7. Add it after the larger basket row on a practice copy. Mark it as a subtotal or total in the chart. When checking the running arithmetic, the checkpoint repeats the 6.7 level without contributing another 6.7 change. The two decreases still take it to 6.1. If the chart treats the checkpoint as an increase, it will distort all subsequent levels. Use the role column to identify which rows are checkpoints and which are parts of the net movement.

An inventory example follows the same reading: begin with 100 items, receive 40, ship 25 and end with 115. The last mark shows 115 from zero. It is not a final delivery of 115 more items. If you changed the ordering of independent signed contributions, the final sum might be unchanged while intermediate levels move. Use an order that matches actual time or a documented analytical decomposition. Don't build a line of independent changes and assume it communicates a running balance.

5. Confirm a funnel represents linked records rather than unrelated totals

Define the unit, start and follow-up window

A real site may record several visits, products, carts or orders for the same person. Five visits can come from one repeat user. Counting sessions at the first stage and individual orders at the end can produce a ratio, but it is a different measure from visitor conversion. To build a funnel that claims how many of the starting people progressed, choose a consistent eligible person or another clearly defined unit. Use unique identifiers appropriately, avoid sharing them in a teaching report and count at most once per stage per unit. In this fixture all figures are already aggregated synthetic counts.

Define the time window for starting eligibility separately from the period allowed to observe later progress. If a visitor arrives just before a reporting cutoff, their order might not have had time to be delivered. A cohort drawn from late dates can appear to perform worse simply because it had less follow-up. Wait for a comparable completed window, label incomplete cohorts or show an intentionally shorter milestone. A ratio can be numerically correct for an incomplete window while answering a different question from the eventual completed-cohort conversion.

For the exercise, all four stage rows cover one consistent completed follow-up window and one qualifying path. When analysing another source, write those rules beside the sheet. Record whether a path must follow each stage in order, how retries are counted, and how a skipped stage is handled. For example, a repeat shopper might move directly from a saved cart to checkout and never record a fresh Cart event in the current feed. The chart artist cannot decide whether to count that visitor under Cart. The event rules and evidence must decide.

Make a small membership audit before trusting the counts

Try writing six fictional IDs A, B, C, D, E and F on paper. All six visit. A, B, C and D reach Cart. A, B and D reach Checkout. Only A and D reach Delivered. The unique nested counts are 6, 4, 3 and 2. Four visitors from the start did not reach the last milestone. The three intermediate differences are 2, 1 and 1. The delivered share of start is one third, while the delivered share of Checkout is two thirds.

Now replace D at the Delivered stage with E, while leaving the previous stages unchanged. The counts still read 6, 4, 3 and 2, so a check for decreasing numbers still passes. But E was not counted in Checkout. The last-stage membership no longer represents a subset of the previous stage under the required path. Inspect missing events, outside-cohort members and alternative paths. The accurate-looking widths do not establish membership. A validation that compares identifiers by stage catches the condition that the count reconciliation cannot.

Compare valid process rates with independent stage snapshots

A pipeline snapshot may report how many open cases are currently in each status. A comparable list might say 50 new, 20 in progress and 5 resolved during a reporting interval. These can be different people, and the units or time rules may differ. It is not valid to divide 5 by 50 and call it the fraction of those 50 who resolved unless linked evidence establishes the relationship. A chart of status counts can still describe current composition or activity as stated. Avoid using a shrinking funnel to imply how the same starting cohort moved if they were disjoint groups.

Try the converse example: in a current snapshot a later status has more records than an earlier one because several weeks of cases have accumulated. Do not sort the statuses by size to make a funnel shape. The chart should keep the process order and describe its meaning. When counts increase in a chart that claims a fixed nested cohort, first audit joins, event duplicates, order of stage events and scope. If later entrants are genuinely allowed, model the flow with a rule and a display that can represent entrants or separate paths.

6. Review signs, denominators and accessibility before sharing

Make the allowed interpretation visible

  1. Read the title and units. Carry the time or period definition and measure in the title or caption. A sales total in lakh rupees is separate from a count of visitors. Keep starting and closing levels on the same unit basis.
  2. Check baseline and totals in a waterfall. Opening, closing and any interim totals start at zero when set as totals. The floating spans represent signed differences. Confirm the selected single-point role settings after making edits.
  3. Reconcile changes or stages independently. Confirm that signed contributions plus opening equal the close. For a nested funnel, check membership, stage totals, denominator definitions and an exact conversion calculation by hand.
  4. Identify the biggest number and why it matters. In the bridge, +0.9 is the largest positive contribution but is not a new sales total. In the funnel, 38,000 is a drop count. It is not an established cause of lost sales.
  5. Test a failure case. Change a verified input on a training copy, compare the updated shape and matching labels, and inspect whether a close or rate now contradicts the audit. Restore the intended sample.
  6. Give a text route to the result. Supply labels, readable exact amounts and a source table. Keep signed additions and reductions distinguishable through plus/minus labels as well as color. Include alt text that names which stages or changes matter.

Document the actual chart feature available to your audience

Microsoft documents waterfall and funnel creation in specific Excel versions and platforms. Look for the requested chart in your installed gallery and use the official platform section. Menu paths and options can differ. If the exact waterfall controls are unavailable, use a running-balance table with the four signed movements and explicit levels. If the exact funnel chart is unavailable, use horizontal bars in process order with a common zero. The arithmetic and survey of source scope are the same. The native chart is a presentation choice, so preserve the exact values even when that choice changes.

A useful single-slide checkout report can show four count bars and a small conversion column rather than a decorative funnel. The width can be read against a shared count axis, and the percent values can be read separately. Ensure every conversion label says whether it uses start or prior stage. When a later stage has a very thin bar, place the number outside or beside the shape so it remains legible. For the waterfall, put explicitly signed values next to the floating changes. A thinner area on a small screen should not make the reason or value disappear.

Use the Excel Task Hub for another exercise. Try the sign and closing audit before drawing a waterfall, and trace one linked ID across the stages when building a funnel. Continue to Treemap and Sunburst for charts that distinguish members and totals across a hierarchy, rather than one sequential path.

Build a checkable stacked-column fallback for this nonnegative bridge

Try a separate model even when the native Waterfall is available. It helps explain where a floating column sits. Use a fresh copy of Sales Bridge with verified running levels in D. This fallback is valid for the exercise's nonnegative running values. A bridge whose intermediate values go below zero needs different handling because chart software stacks negative and positive values in different directions. Keep the complete source and independent close beside the helper. Do not plot the raw signed changes directly as positive stacks without computing the positions.

Use E for Invisible base, F for Increase amount, G for Decrease magnitude and H for Total amount. Enter the formulas below, then fill to row 7. A total starts at zero. For a change, the lower of its two levels is the base, and the movement magnitude sits on that base. For a decrease, use the positive width of the downward movement in the helper, while showing its negative sign in the source and chart labels. This keeps position and meaning distinct.

E2 =IF(OR(C2="Opening total",C2="Closing total"),0,MIN(D1,D2))
F2 =IF(C2="Increase",B2,0)
G2 =IF(C2="Decrease",-B2,0)
H2 =IF(OR(C2="Opening total",C2="Closing total"),B2,0)

Make a new ordinary stacked-column chart with the labels from A2:A7 and the four helper series in E through H. Put the Invisible base series at the bottom. Set its displayed fill and border to none on the practice chart. It still positions the colored marks above it. Keep the worksheet helper visible as evidence. Give the other three series a clear key and state that the plotted decrease height is its magnitude while the original value is signed.

Check the Cancellations row. Its before and after levels are 6.7 and 6.3. E gives 6.3, the invisible base. G gives 0.4, so the visible mark spans 6.3 to 6.7. The movement is downward from the previous 6.7 to 6.3. Mark it as -0.4 in a label or nearby table, because a positive stored width in the helper is just geometry. For the new-customer increase the base is 5.0 and F is 0.8. For the close only H is 6.1. Compare those three checks to the native chart where available.

If the helper uses a Checkpoint role in another extension, revise the formula to recognize that role as a total too. The provided formulas are written for the original six sample rows. Verify each revised default on a test copy. If the earlier close mismatch remains, both chart styles can still visually end at a separately stated total while the prior running level differs. A summary difference check is essential even with a properly formatted chart.

Track a funnel's selection when reporting a subset of channels

Suppose the analyst wants to report visits from one campaign only. The start set must use that eligibility rule and each later milestone must be linked to those same units. Do not filter the first number to campaign traffic while leaving the total shop's delivered count as the last stage. If campaign attribution changes between stages, establish which event fixes the cohort membership and confirm it in the raw lookup. Recalculate both step and overall percentages for the same source. A subset filter can change rates without changing any underlying measurement rule.

Consider a future sample in which 200 eligible start records come from one source and 800 from another. Source A has 40 delivered and source B has 80 delivered. Their rates are 20 and 10 percent. The pooled rate is 120 of 1000, or 12 percent. The mean of the two rates is 15 percent. If you show separate funnels, place eligible counts beside them. A small higher-rate source may contribute fewer completed visitors. Use an explicitly weighted calculation or a source table to answer the overall question.

Distinguish a stage that was reached from time spent there

A count funnel tracks membership at stage milestones. It does not measure how long a stage took. A narrow Delivered stage may arise from many unresolved orders, and the stages can share the same count even if one took far longer. To understand timing, calculate a duration with well-defined clocks and identify records that had not completed by the cutoff. That is a distinct measure that might need a distribution, a time-series or an exact table. Do not use the horizontal width of a funnel stage to estimate minutes without a separate dataset.

A useful workshop scenario is to compare a completed follow-up with an early snapshot. In the original funnel, imagine that only 7000 of the eventual 7900 deliveries were observed at an earlier cutoff. This would show 14.0 percent of the original visits at that point, compared with 15.8 percent after completed follow-up. The 900 gained records can be explained by the time of observation in this exercise, and do not show improvement between two independent populations. Label which cutoff is current. Keep earlier reports identifiable so the audience can see why the later rate changed.

Ask one last question about the source of a difference

When readers see a change in a bridge or funnel, they may ask which team or action caused it. Give them the most precise supported statement first. A bridge can explain how a documented allocation reconciles to the observed total. A funnel can tell how many linked units reached the next stage by the cutoff. For a cause, source the extra evidence and name what is still unknown. This separation makes the visual useful for planning a follow-up without assigning conclusions the spreadsheet cannot establish.

7. Interview questions with practical answers

When do you use a waterfall rather than a funnel?

Use a waterfall to explain how one numeric level changed through signed components. A funnel describes stage measurements, often the progression of a verified cohort. The waterfall's contributions sum to its movement. Funnel stage counts already include surviving members and should not be added as if they were separate populations.

Why set the final waterfall column as a total?

The final number is a full level. If November 6.1 is treated as another increase after the running level already reached 6.1, the chart visually reaches 12.2. Mark the closing point as a total and check its value separately against starting amount plus signed changes.

Can two descending counts prove a valid conversion?

Only with the right membership and measurement rules. Later counts must come from the earlier eligible set if you are reporting stage conversion. Check identifiers, follow-up windows and event order. A count named Delivered might otherwise represent orders from a different set of visitors.

How do you read overall versus step conversion?

Overall conversion divides a specified stage by the starting cohort. Step conversion divides by the previous stage. Final delivered in the training example is 15.8 percent of the initial cohort, and about 92.94 percent of Checkout. Label the denominator for each result.

How do you handle a waterfall that does not reconcile?

Check signed amounts, role flags, measure definitions and scope. If a contribution correction takes the calculated close to 6.0 while the observed close is 6.1, flag the -0.1 difference. A total setting changes the chart's placement; it does not resolve the source discrepancy.

8. Predict the balance or conversion

What level follows the two increases in the sales bridge?

6.7 lakh, since 5.0 plus 0.8 plus 0.9 equals 6.7. The cancellations bring it down to 6.3 and the returns to 6.1. A checkpoint at 6.7 reflects that existing level.

What is the net sales change and its relative size?

The net increase is 1.1 lakh, or 22 percent of the initial 5.0 lakh. The final 6.1 is the total level. It should not be treated as another component of the change.

How many eligible visitors reach Checkout, as a share of start?

8500 out of 50000, or 17.0 percent. From Cart to Checkout the denominator is 12000, giving about 70.83 percent. Both answer a valid question with their own labels.

If a later stage has a positive count after a prior count of zero, what do you check?

Verify it is truly a nested path for one cohort. A zero prior stage makes the next division undefined and should leave zero eligible descendants. Check source filters, membership, mixed time windows and event coverage before publication.

Which transition loses 600 of the eligible records?

Checkout to Delivered, from 8500 to 7900. Six hundred is the count omitted from the next stage within this definition. It does not identify the reason the records stopped.

9. Six reminders

  • Waterfall changes have signs.

    Each floating step connects the old and new level.

  • Anchor totals at zero.

    Check the opening and closing roles and never add a repeated subtotal.

  • Reconcile from source numbers.

    Chart roles improve display but cannot correct a missing amount.

  • Funnel counts need a common unit.

    Follow the same eligible cohort and same progress rule.

  • Name each denominator.

    Previous-stage and start conversion answer separate questions.

  • Inspect claims outside the chart.

    A shape reveals a change or drop; the source establishes definitions and evidence.

Microsoft references