Ravindra BagaleCourses & study guides मराठी Track your progress

22. KPI in All Industries

Excel

22.10 Manufacturing

Plant interviews around Chakan (Pune) and Ambad (Nashik) ask scrap and whether the line was actually available. "We ran 1,000 pieces" is not a KPI when 300 of them are scrap. These plants are fictional labels for class, not a company's shift report.

OEE (Overall Equipment Effectiveness) needs availability, performance, and quality. This table has the first and the third. Do not invent a performance factor to make OEE look complete.

KPI What the number means Who uses it Action it drives
Availability (Planned minutes minus down minutes) divided by planned minutes. Production lead A long down time is maintenance or material. Do not ask the line for more pieces that hour.
Scrap % (Total pieces minus good pieces) divided by total pieces. Quality and production High scrap stops the line. More output with the same scrap rate wastes material.
Good pieces Count that passed. Dispatch This is what can be shipped. Total pieces cannot.

About this data: The KPIs in this Manufacturing lesson are worked out from a fictional manufacturer with six production lines at Chakan (Pune), Ambad (Nashik), Kolhapur and Nagpur. The figures are made up for this lesson and do not come from any real company or person.

Fictional sample rows. One shift. Every line was planned for 480 minutes and counted 1,000 pieces so the vanity metric is obvious. Type these rows into a new sheet from cell A1, press Ctrl + T, and name the table tblLines (Table Design › Table Name).

Line Plant Planned min Down min Good pcs Total pcs
Line A Chakan, Pune 480 48 900 1,000
Line B Chakan, Pune 480 120 700 1,000
Line C Ambad, Nashik 480 24 950 1,000
Line D Ambad, Nashik 480 96 800 1,000
Line E Kolhapur 480 60 850 1,000
Line F Nagpur 480 30 920 1,000

About this data: The tblLines table has one row per production line and the columns Line, Plant, Planned min, Down min, Good pcs and Total pcs. The figures are made up for this lesson and do not come from any real company or person.

Excel formulas for the whole file (type them in empty cells below or beside the table):

KPI Excel formula Result Number format
Availability =(SUM(tblLines[Planned min])-SUM(tblLines[Down min]))/SUM(tblLines[Planned min]) 86.9% 0.0%
Scrap % =(SUM(tblLines[Total pcs])-SUM(tblLines[Good pcs]))/SUM(tblLines[Total pcs]) 14.7% 0.0%

About this data: Each formula above reads whole columns of the tblLines table. Every column holds minutes and pieces, so no currency format is needed. The figures are made up for this lesson and do not come from any real company or person.

Calculated columns (one result per row). Click the first empty column of the table, type the header, then the formula. The Table fills every row by itself.

New column Formula in the first row
Availability =([@[Planned min]]-[@[Down min]])/[@[Planned min]]
Scrap % =([@[Total pcs]]-[@[Good pcs]])/[@[Total pcs]]

About this data: The calculated columns use the same six fictional rows of the tblLines table, so you can change any number and watch each row's result update. The figures are made up for this lesson and do not come from any real company or person.

Expected result per row:

Line Availability Scrap %
Line A 90.0% 10.0%
Line B 75.0% 30.0%
Line C 95.0% 5.0%
Line D 80.0% 20.0%
Line E 87.5% 15.0%
Line F 93.8% 8.0%

About this data: These results are worked out from the six fictional production lines in the tblLines table above. They do not describe any real company or person.

Always calculate the file-level KPI as a ratio of totals (SUM ÷ SUM). Do not take the AVERAGE of the per-row percentages; a small row would count as much as a big one.

Good KPI Vanity metric
From the same rows Line B scrap 30.0% and availability 75.0% Every line's 1,000 pieces
Why Line B and Line C "produced the same". They did not. A dashboard of total pieces is a flat bar. It cannot start a maintenance job.

About this data: The good KPI and the vanity metric both come from the same fictional rows of the tblLines table, so the comparison is fair. The figures are made up for this lesson and do not come from any real company or person.

What the manager does. The Pune (Chakan) manager stops Line B and reads the 120 down minutes before the next shift starts. The Nashik (Ambad) manager uses Line C as the standard and looks at Line D, where scrap is 200 ÷ 1,000 = 20.0% and availability is (480 − 96) ÷ 480 = 80.0%. Do not congratulate Nagpur only because 920 good pieces is close to 1,000. Say the scrap: 8.0%.

Ravindra Bagale's Tip

If the file has no performance data, do not write OEE. Show availability and scrap % separately; that is more honest.

Practice tasks (6)

Use the tblLines table from this lesson (6 fictional rows). Open a hint only if you are stuck, and check your result against the answer.

1. Write one formula that works out Scrap % for the whole tblLines table, and give it the number format 0.0%.

Hint: Read whole columns of the Table by name, such as tblLines[Planned min], so new rows are included.

Answer: =(SUM(tblLines[Total pcs])-SUM(tblLines[Good pcs]))/SUM(tblLines[Total pcs]) gives 14.7%.

2. Work out Scrap % for Chakan, Pune only.

Hint: Replace each SUM with SUMIFS and add the condition tblLines[Plant] = "Chakan, Pune".

Answer: =(SUMIFS(tblLines[Total pcs],tblLines[Plant],"Chakan, Pune")-SUMIFS(tblLines[Good pcs],tblLines[Plant],"Chakan, Pune"))/SUMIFS(tblLines[Total pcs],tblLines[Plant],"Chakan, Pune") gives 20.0%.

3. Add a calculated column Availability to the Table. Which line has the highest Availability?

Hint: Type the header in the first empty column, then the formula using [@column] references. The Table fills every row.

Answer: Line C, with 95.0%.

4. Which line has the lowest Scrap %?

Hint: Add Scrap % as a calculated column, then sort that column from smallest to largest.

Answer: Line C, with 5.0%.

5. What if Planned min for Line C changes from 480 to 576? Work out the new whole-table Availability.

Hint: Type the new value in the Table. Formulas that read whole columns update by themselves.

Answer: Availability changes from 86.9% to 87.3%.

6. How many lines have Availability above the whole-table Availability?

Hint: Compare each row of the Availability column with the whole-table result, 86.9%.

Answer: 4: Line A, Line C, Line E, Line F.

Loading practice tasks...

  1. Total Down min (Easy): Add up the "Down min" column to get one total for all six production lines.
  2. Average Good pcs (Easy): Work out the average of the "Good pcs" column across the six production lines. Round the answer to 2 decimal places.
  3. Production lines in Chakan, Pune (Easy): Count how many rows have "Chakan, Pune" in the "Plant" column.
  4. Largest Down min (Easy): Find the largest value in the "Down min" column.
  5. Down min for Chakan, Pune (Medium): Add up the "Down min" column only for the rows where "Plant" is "Chakan, Pune".
  6. Availability for all production lines (Medium): Work out the Availability for all six production lines. It is (the total of "Planned min" minus the total of "Down min") divided by the total of "Planned min". Round the answer to 3 decimal places, so 0.125 means 12.5%.
  7. Look up Line D (Medium): Find the "Good pcs" value for Line D.
  8. Largest Good pcs in Chakan, Pune (Medium): Find the largest "Good pcs" value among the rows where "Plant" is "Chakan, Pune".
  9. Availability for Line A (Medium): Work out the Availability for Line A, using only the values in that one row. Round the answer to 3 decimal places, so 0.125 means 12.5%.
  10. Scrap % for all production lines (Hard): Work out the Scrap % for all six production lines. It is (the total of "Total pcs" minus the total of "Good pcs") divided by the total of "Total pcs". Round the answer to 3 decimal places, so 0.125 means 12.5%.
  11. Availability for Chakan, Pune (Hard): Work out the Availability only for the rows where "Plant" is "Chakan, Pune". Round the answer to 3 decimal places, so 0.125 means 12.5%.
  12. Above or below average (Hard): Show "Above" if the "Down min" value for Line A is more than the average of the "Down min" column, and show "Below" if it is not.