21.2 Budget vs Actual Report
The ask. Priyanka Shinde runs finance for a fictional Pune dark store. She needs a monthly budget vs actual sheet: the variance for each cost head, the variance %, and a flag for any head that is more than 5% over budget.
Sheet Costs, A1:C6 (November, fictional):
| A: Cost head | B: Budget (₹) | C: Actual (₹) |
|---|---|---|
| Rent | 60,000 | 60,000 |
| Rider wages | 1,80,000 | 1,96,500 |
| Electricity | 24,000 | 21,900 |
| Packaging | 30,000 | 33,600 |
| Local marketing | 20,000 | 12,500 |
About this data: Teaching sample for a fictional shop “CityBasket Retail”. Figures and names (e.g. Priya Deshmukh) are made up for this lesson on budget vs actual report.
What to deliver (one under the other):
- Make the range a Table named
tblCosts. - Add Variance (₹) = Budget − Actual. Positive means under budget. Write this rule in a note above the table.
- Add Variance % = Variance ÷ Budget.
- Add Flag: "Over budget" when actual is more than 5% above budget, "Under budget" when actual is below budget, else "On budget".
- Add totals with SUM, and total variance % = total variance ÷ total budget.
- Highlight Over budget rows in light red.
Key formulas (row 2; copy down or let the Table fill them):
D2: =[@Budget]-[@Actual]
E2: =[@Variance]/[@Budget]
F2: =IF(([@Actual]-[@Budget])/[@Budget]>5%,"Over budget",IF([@Actual]<[@Budget],"Under budget","On budget"))
Total variance %: =SUM(tblCosts[Variance])/SUM(tblCosts[Budget])
Expected result (check your numbers):
| Cost head | Variance (₹) | Variance % | Flag |
|---|---|---|---|
| Rent | 0 | 0.0% | On budget |
| Rider wages | -16,500 | -9.2% | Over budget |
| Electricity | 2,100 | 8.8% | Under budget |
| Packaging | -3,600 | -12.0% | Over budget |
| Local marketing | 7,500 | 37.5% | Under budget |
| Total | -10,500 | -3.3% | — |
About this data: Demo table only — not real customer or company data. Built to practise budget vs actual report.
Total budget ₹3,14,000, total actual ₹3,24,500. The store is ₹10,500 over budget in total, but Rider wages alone are ₹16,500 over. The total hides the problem.
Checks before you send it:
- The sign rule (positive = under budget) is written on the sheet.
- Variance % uses the budget as the denominator.
- Rider wages and Packaging are flagged.
- The total row does not add the percentages.
Ravindra Bagale's Tip
Write the sign rule on the sheet: "positive variance = under budget". Half the arguments in a review meeting come from people reading the sign the other way.
Ravindra Bagale's Tip – मराठी
Sheet वर sign चा नियम लिहून ठेवा: "positive variance = under budget". Review meeting मधले अर्धे वाद sign उलटा वाचल्यामुळे होतात.
Ravindra Bagale's Tip – हिंदी
Sheet पर sign का नियम लिख दें: "positive variance = under budget". Review meeting की आधी बहस sign उल्टा पढ़ने से होती है.
Loading practice tasks...
- Total budget (Easy): Add up Budget (£) in C2:C11. (sheet "Data")
- Total actual (Easy): Add up Actual (£) in D2:D11. (sheet "Data")
- Total variance (Easy): Add up Variance (£) in E2:E11. (sheet "Data")
- Min variance (Easy): Smallest Variance (£) in E2:E11. (sheet "Data")
- Pune rows (Easy): How many rows have City "Pune"? (sheet "Data")
- Admin budget (Medium): Total of Budget (£) where Dept is "Admin". (sheet "Data")
- Over budget (Medium): How many lines have Variance (£) < 0? (sheet "Data")
- Actual of Marketing (Medium): Actual (£) for Line "Marketing". (sheet "Data")
- London budget (Medium): Total of Budget (£) where City is "London". (sheet "Data")
- Share Admin budget (Hard): Admin budget / all budget, 3 decimals. (sheet "Data")
- Avg actual (Hard): Average of Actual (£) in D2:D11, rounded to 1 decimal. (sheet "Data")
- Over flag (Hard): "Over" if E2 < 0 else "OK". (sheet "Data")
Worked example — budget vs actual report
Why
Rohan Patil in Pune and Anna Kowalski abroad both need a clear, repeatable way to use budget vs actual report on a FreshGo Mart sheet without breaking totals.
What
Budget Vs Actual Report is the Excel idea this page teaches. We will walk one tiny example end to end.
How
- Open a blank sheet. In A1 type a short label for budget vs actual report.
- Enter a small made-up value for Rohan Patil using £ where money appears.
- Add a second value for Anna Kowalski using £ so you see mixed currencies stay numeric.
- Apply the method from this lesson step by step (menu or formula as shown above).
- Check the result still works inside SUM or a simple check cell.
Formula / action
Follow the formula or ribbon steps shown in this lesson (keep values numeric).
Meaning: Once budget vs actual report is correct on one row, copy the same pattern down the column.