Ravindra BagaleCourses & study guides मराठी Track your progress

36. KPI in All Industries

Power BI

36.12 Logistics

Dispatch interviews ask on-time delivery, damage, and cost per shipment. Kilometres driven, and shipment count, do not tell you the lane that failed. Depots here are fictional.

Table 1: columns KPI, What the number means, Who uses it, Action it drives
KPI What the number means Who uses it Action it drives
On-time % Shipments delivered on time divided by shipments. Lane owner A lane under the promise gets a different cutoff or a different carrier in the practice file.
Damage % Damaged shipments divided by shipments. Warehouse and dispatch Damage is a packing or handling problem. Do not hide it inside "delivered".
Cost per shipment Cost divided by shipments. Dispatch manager A cheap lane that is late is not cheap. Read it beside on-time.

About this data: This table uses columns: KPI, What the number means, Who uses it, Action it drives. This table uses columns: Lane, Shipments, On time, Damaged, Cost. This table uses columns: Good KPI, Vanity metric. Values shown are the lesson examples already on this page (not a new dataset).

Fictional sample rows. One week.

Table 2: columns Lane, Shipments, On time, Damaged, Cost
Lane Shipments On time Damaged Cost
Pune, then Nashik 40 36 1 ₹20,000
Pune, then Kolhapur 20 10 2 ₹16,000
Nashik, then Nagpur 30 27 0 ₹18,000
Nashik, then Pune 25 22 1 ₹12,500
Kolhapur, then Mumbai 16 12 2 ₹9,600
Nagpur, then Sambhaji Nagar 24 18 3 ₹14,400

Worked from those rows.

  • Shipments 155. On time 125. Damaged 9. Cost ₹90,500.
  • On-time % is 125 ÷ 155 = 80.6%.
  • Damage % is 9 ÷ 155 = 5.8%.
  • Cost per shipment is 90,500 ÷ 155 = ₹584 (nearest rupee).

Pune, then Kolhapur: on time 10 ÷ 20 = 50.0%, damage 2 ÷ 20 = 10.0%, cost per shipment 16,000 ÷ 20 = ₹800. Nashik, then Nagpur: on time 27 ÷ 30 = 90.0%, damage 0, cost 18,000 ÷ 30 = ₹600.

Table 3: columns Good KPI, Vanity metric
Good KPI Vanity metric
From the same rows Pune, then Kolhapur on time 50.0% Pune, then Nashik 40 shipments
Why Half the Kolhapur lane was late, at ₹800 each. The Nashik lane has the most trips and looks like the "main work". It is actually the healthier cheap-enough lane (36 ÷ 40 = 90.0% on time).

What the manager does. The Pune dispatch manager opens the 10 late Kolhapur shipments (cutoff time, or a truck that left after the dock closed) before adding a second truck on the Nashik lane. The Nashik manager keeps the Nagpur lane as the pattern and checks the one damaged box on Nashik, then Pune, not the shipment count. Nagpur, then Sambhaji Nagar damage is 3 ÷ 24 = 12.5%. That is a packing conversation, not a volume conversation.

Ravindra Bagale's Tip

Friends, many students count damaged-but-early boxes as "on time" in on-time %. Show damage separately. If the customer got the box and it was broken, that is not on time. Pay attention!

Loading DAX practice tasks...

  1. Total Parcels (Easy): Measure: Parcels Sum = SUM of Parcels.
  2. Rows per Hub (Easy): Shown per Hubs Name. Measure: Row Count = number of Shipments rows.
  3. On-Time Rate (Medium): Shown per Hubs Name. Measure: On-Time Rate = SUM of OnTime ÷ SUM of Parcels.
  4. On-Time Rate against target (Hard): Shown per Hubs Name. Measure: On-Time Rate Status = "On target" when On-Time Rate is >= 0.9, else "Check".
  5. Parcels for Air only (Medium): Shown per City. Measure: Parcels Air = SUM of Parcels where Mode is "Air".
  6. Share of Parcels (Medium): Shown per Hubs Name. Measure: Parcels Share = SUM of Parcels ÷ SUM of Parcels for all of Hubs.
  7. Parcels minus OnTime (Hard): Shown per Mode. Measure: Gap = SUMX over Shipments of Parcels − OnTime.
  8. Parcels in the first half-year (Medium): Shown per Country. Measure: H1 Parcels = SUM of Parcels for ShipDate before 1 Oct 2025.
  9. Highest damaged parcels per Mode (Easy): Shown per Mode. Measure: Max Damaged = MAX of Damaged.
  10. Parcels of the top 2 (Hard): Measure: Top 2 Parcels = [Total Parcels] for the 2 best Hubs names.