Ravindra BagaleCourses & study guides मराठी Track your progress

36. KPI in All Industries

Power BI

36.11 Inventory and Supply Chain

Planners ask days of cover and how many days the SKU was stocked out. A high on-hand number feels safe and is often cash stuck in the godown. Module 35.6 is the dashboard brief.

Table 1: columns KPI, What the number means, Who uses it, Action it drives
KPI What the number means Who uses it Action it drives
Days of cover On hand divided by average daily sales. Here, daily sales are the 30-day quantity divided by 30. Planner Cover under 15 days: raise a PO. Cover over 90 days: stop the next PO.
Stockout rate Stockout days divided by days in the window (30). Planner, store lead A stockout is lost sales. On-hand today does not show last week's empty shelf.
On hand Units in the godown today. Only with cover A large on-hand of a slow SKU is not a healthy warehouse.

About this data: This table uses columns: KPI, What the number means, Who uses it, Action it drives. This table uses columns: SKU, City, On hand, Sold in 30 days, Stockout days. This table uses columns: Good KPI, Vanity metric. Values shown are the lesson examples already on this page (not a new dataset).

Fictional sample rows. A snapshot, plus the last 30 days of sales. Do not add these on-hand numbers across seven dates (Module 35.6).

Table 2: columns SKU, City, On hand, Sold in 30 days, Stockout days
SKU City On hand Sold in 30 days Stockout days
Atta Pune 300 300 0
Oil Pune 600 150 0
Rice Nashik 40 120 6
Dal Nashik 90 90 0
Sugar Kolhapur 20 60 10
Tea Nagpur 200 50 0

Worked from those rows.

  • On hand 1,250. Sold 770. Stockout days 16 across 6 SKUs × 30 days = 180 SKU-days.
  • Days of cover for the file is on hand divided by daily sales. Daily sales are 770 ÷ 30. Cover is 1,250 ÷ (770 ÷ 30) = 48.7 days.
  • Stockout rate is 16 ÷ 180 = 8.9%.

Rice in Nashik: daily sales 120 ÷ 30 = 4, cover 40 ÷ 4 = 10.0 days, stockout 6 ÷ 30 = 20.0%. Oil in Pune: daily sales 150 ÷ 30 = 5, cover 600 ÷ 5 = 120.0 days, stockout 0.

Table 3: columns Good KPI, Vanity metric
Good KPI Vanity metric
From the same rows Rice cover 10 days, oil cover 120 days Oil on hand 600, the biggest pile
Why Rice will run out. Oil will sit for four months. A "stock health" card that sorts by on-hand puts oil first and rice last. That is the wrong purchase order.

What the manager does. The Nashik planner raises a rice order this week and does not touch dal (cover 90 ÷ (90 ÷ 30) = 30 days). The Pune planner cancels or delays the next oil purchase. Atta in Pune is 300 ÷ (300 ÷ 30) = 30 days, which is the planned cover in this file. Leave it. Kolhapur sugar is also 10 days of cover and was stocked out 10 of 30 days. Same action as Nashik rice.

Ravindra Bagale's Tip

A common mistake is to SUM on hand across seven snapshot dates. Stock becomes seven times too big. Keep the last date, then work out the cover. Do not add the snapshot and the ledger together. Don't forget this.

Loading DAX practice tasks...

  1. Units Received (Easy): Measure: UnitsIn Sum = SUM of UnitsIn.
  2. Sell Through (Medium): Shown per Warehouses Name. Measure: Sell Through = SUM of UnitsOut ÷ SUM of UnitsIn.
  3. Sell Through against target (Hard): Shown per Warehouses Name. Measure: Sell Through Status = "On target" when Sell Through is >= 0.8, else "Check".
  4. Sell Through for Electronics (Hard): Shown per Country. Measure: Sell Through Electronics = Sell Through where ItemGroup is "Electronics".
  5. UnitsIn for Electronics only (Medium): Shown per City. Measure: UnitsIn Electronics = SUM of UnitsIn where ItemGroup is "Electronics".
  6. Share of UnitsIn (Medium): Shown per Warehouses Name. Measure: UnitsIn Share = SUM of UnitsIn ÷ SUM of UnitsIn for all of Warehouses.
  7. Average UnitsIn per row (Medium): Shown per Warehouses Name. Measure: UnitsIn per Row = SUM of UnitsIn ÷ number of rows.
  8. Rows with high stock-out days (Medium): Shown per Country. Measure: High StockoutDays Rows = number of rows where StockoutDays is more than 5.
  9. Average stock-out days per country (Easy): Shown per Country. Measure: Avg StockoutDays = AVERAGE of StockoutDays.
  10. Rank by UnitsIn (Hard): Shown per Warehouses Name. Measure: UnitsIn Rank = rank of [Units Received] among all Warehouses Name values.